Kazakhmys Invests Over 900 Million Tenge in Jezkazgan Copper Smelter Cooling Tower Restoration
Kazakhmys has begun a major overhaul of cooling tower No. 1 at the Jezkazgan Copper Smelter, investing 921.8 million tenge. The 1971-built facility, deemed inoperable in 2021 and closed in 2024 after partial collapse, is crucial for the smelter's sulfuric acid production. Restoration is expected to be completed within 150 days.
Read the full article at Informburo →
Headline and summary written by daryo. The full report belongs to Informburo.