Uzbekistan plans high-speed rail Tashkent-Samarkand by 2027, boosts freight capacity
Uzbekistan aims to significantly develop its railway infrastructure by 2030, including building 545 km of new lines and increasing electrification to 65%. A high-speed rail line between Tashkent and Samarkand is planned for construction starting in 2027. The country anticipates a tenfold increase in freight transport capacity following the China-Kyrgyzstan-Uzbekistan railway launch.
Read the full article at Spot →
Headline and summary written by daryo. The full report belongs to Spot.