Afghanistan prepares to divert Amu Darya water to Qosh Tepa canal
Afghanistan's National Development Corporation announced the second phase of the Qosh Tepa canal construction is nearing completion, with preparations underway to divert water from the Amu Darya river. Excavation is 99% complete, with bridge and water control structure construction ongoing. Specific timelines and water volumes were not disclosed.
Read the full article at Gazeta.uz →
Headline and summary written by daryo. The full report belongs to Gazeta.uz.