Kyrgyzstan and China Discuss Energy Grid Integration and Cross-Border Power Line by 2027
Kyrgyzstan and China have discussed integrating their energy systems and building a cross-border power line for electricity imports from China. The new infrastructure is proposed for commissioning in December 2027. This was reported by the Ministry of Energy of Kyrgyzstan following a meeting in Qingdao.
Read the full article at Economist.kg →
Headline and summary written by daryo. The full report belongs to Economist.kg.