Kazakhstan Builds Major Power Plant in Turkistan to Address Electricity Shortage
Kazakhstan is constructing a significant power plant in the Turkistan region as part of a strategy to achieve energy surplus by 2029. The "Turkistan" gas turbine plant, with a capacity of 1113.4 MW, aims to reduce electricity shortages in southern regions and ensure stable supply. Construction is 62% complete.
Read the full article at Egemen Qazaqstan →
Headline and summary written by daryo. The full report belongs to Egemen Qazaqstan.